Portable Steam Generation



The Sahtu-RCS line of rental and rental purchase steam generators do not require, piles, engineered surface locations and or any other type of pre-foundation work.

 

Application Use of Sahtu-RCS Portable Steam Generation

  • Warm-up phase of new wells
  • Temporary steam for shutdowns and repairs of existing facilities
  • Pilot steam facilities
  • SAGD Primary
  • Cyclical steaming application
  • Remote test wells 

 

Financial benefits

  • Flexible monthly rental charges with Rent to purchase options available
  • NO capital outlay

 

Operational and Engineering support

  • Full operational support can be supplied
  • Heavy oil Technicians with 10-15 years experience
  • Reservoir support
  • Engineer support

 

Specifications for a Typical Sahtu-RCS 25mmBtu:

  • 220m3-270m3/day total H20 at 80% steam quality
  • Capability to run a steam separator to achieve 95% steam quality or higher
  • 3-1 turn down for warm up phase
  • Dual fuel, diesel or natural gas     
  • 3-5 days set-up time required
  • 36000kg to 55000kg gives the ability to move in during 75% road ban condition with proper equipment

 

Water Treatment

  • Complete dual drain softener package, remote water treatment not required
  • Compact design to fit in the same building as OTSG
  • Heavy oil treatment for pressure or atmospheric treating processes

 

Our equipment can be custom manufactured to your project requirements.